Skip to main content

OUTAGES: 406.222.7778      AFTER HOURS: 1.855.999.9492     CONTACT: 406.222.3100

Home
Quick Pay
Forms & Apps
Member Portal
Contact Us
Solar Output
Menu
  • Home
  • Member Center
    • Membership
    • Billing FAQ
    • Delinquency and Disconnection
    • Financial Assistance
    • Gift of Energy
    • Reading Your Bill
    • Accessing Your Account Online
    • Payment Options
    • Rental Accounts
    • Capital Credits
    • Forms and Applications
    • Rates
  • Programs & New Services
    • New Services
      • Construction Aid
      • Contracts and Easements
      • Permits
    • Green Power
    • Heat Rate Program
    • Outdoor Lighting
    • Renewable Energy Interconnection
      • Direct Purchase
      • Net-Metering
    • Irrigation Serivces
  • Energy Efficiency
    • Energy Star Rebates
    • Reducing Demand
    • Appliances and Lighting
    • Building Materials
    • Heating and Cooling
    • Smart Water Use
    • Smart Home
    • Touchstone Energy Savings
  • Outages & Safety
    • Outage Info
    • Call Before You Dig
    • Electrical Safety
    • Electrical Safety Demonstrations
    • Storm Preparedness
  • About Us
    • Board of Trustees
      • Approved Board Meeting Minutes
    • Community News
      • Cooperative Newsletter
      • Educational Solar Array
      • History of Rural Electric Cooperatives
    • Energy Portfolio
    • Cooperative Principles
    • Bylaws
    • Annual Meeting
    • About Touchstone Energy
    • Careers at Park Electric
    • Youth Opportunities
      • Scholarship and Apps
      • Youth Tour to Washington DC
    • Service Territory
    • Contact Us
  • Location & Hours

Renewable Energy Interconnection

You are here

  1. Programs & New Services
  2. Renewable Energy Interconnection

Around the country and in Montana there has been considerable interest in generating electricity with renewable sources. These include the wind, sun, small hydro and biomass. The thought of generating clean electricity to power their homes appeals to a lot of people.

Small renewable energy systems can be interconnected to the grid or used in a stand alone application. A grid-connected system can reduce consumption of utility supplied electricity when it's operating and still allow utility power to flow when needed. Stand alone systems may be desired if there are not utility lines nearby.

Park Electric has two options for grid-connected systems. Depending on the size of the generator a member may choose to interconnect using a net metering agreement or as a qualifying facility.

  • Net-Meter
  • Direct Purchase

If you intend to install a renewable system please contact our office several months prior to the connection. Depending on the size and type of connection specialized equipment may be needed. Any additional costs associated with the connection are the member's responsibility. To download a renewable interconnection application click the link below:

  • Renewable Energy Interconnection Application (PDF)

For more information on renewable energy check out the following links:

  • www.awea.org
  • www.ncat.org
  • www.montanagreenpower.com

Cost of Net Metering Video


Note: This page includes downloadable files that are in Adobe PDF format and require Adobe Acrobat Reader. You can download Acrobat Reader free of charge from Adobe's web site. This is a safe, fast and easy installation.

Back to Top

Quick Links

  • Contact Us
  • News
  • Outage Reporting

Contact Info

Park Electric Cooperative, Inc.
5706 US Hwy 89 S
Livingston, MT 59047

Service: 406.222.7778
Outages (M-F 8-5): 406.222.7778
After Hours Outages: 1.855.999.9492
Office: 406.222.3100

Email: info@parkelectric.coop

About Us

Our Mission is to bring value to our member-owners and communities by providing reliable electricity and superior customer service at fair and reasonable prices.

Follow Us Online

©2025 Park Electric Cooperative. All Rights Reserved.

  • Home
  • Member Center
    • Membership
    • Billing FAQ
    • Delinquency and Disconnection
    • Financial Assistance
    • Gift of Energy
    • Reading Your Bill
    • Accessing Your Account Online
    • Payment Options
    • Rental Accounts
    • Capital Credits
    • Forms and Applications
    • Rates
  • Programs & New Services
    • New Services
      • Construction Aid
      • Contracts and Easements
      • Permits
    • Green Power
    • Heat Rate Program
    • Outdoor Lighting
    • Renewable Energy Interconnection
      • Direct Purchase
      • Net-Metering
    • Irrigation Serivces
  • Energy Efficiency
    • Energy Star Rebates
    • Reducing Demand
    • Appliances and Lighting
    • Building Materials
    • Heating and Cooling
    • Smart Water Use
    • Smart Home
    • Touchstone Energy Savings
  • Outages & Safety
    • Outage Info
    • Call Before You Dig
    • Electrical Safety
    • Electrical Safety Demonstrations
    • Storm Preparedness
  • About Us
    • Board of Trustees
      • Approved Board Meeting Minutes
    • Community News
      • Cooperative Newsletter
      • Educational Solar Array
      • History of Rural Electric Cooperatives
    • Energy Portfolio
    • Cooperative Principles
    • Bylaws
    • Annual Meeting
    • About Touchstone Energy
    • Careers at Park Electric
    • Youth Opportunities
      • Scholarship and Apps
      • Youth Tour to Washington DC
    • Service Territory
    • Contact Us
  • Location & Hours